Roofing & Cladding Site Inspections

A typical scope of works for our Independent Site Inspections would be as follows;

Metal Roof Checks
(100% Roof Walked,  detailed checks carried out to approximately 10% of Main Area)

  1. Installation of gutters and outlets (joints checked with probe & peel tests carried out)
  2. Installation of liner panels (fixing layout / laps / type of fixings & washers / seals effective)
  3. Installation of cavity spacer system & insulation (fixing layout, bracket centres / bar installation / insulation continuity)
  4. Installation of top sheets / composite panels (fixing layout / laps / seals effective)
  5. Flashing details (sealing, laps, fixing layout)
  6. Seals around penetrations (upstand height, quality of detailing, welds checked with probe) 

Single Ply Roof Checks

(100% Roof Walked,  detailed checks carried out to approximately 10% of Main Area)

  1. Installation of gutters and outlets (joints checked with probe & peel tests carried out)
  2. Installation of insulation boards (fixing layout / type of fixings & washers / board layout)
  3. Installation of metal decking (fixing layout, lap distance, seals effective)
  4. Installation of single ply membrane (fixing layout, lap distance, upstands, welds checked with probe)
  5. Seals around penetrations (upstand height, quality of detailing, welds checked with probe)

Wall Cladding Checks

(100% Elevations Walked,  detailed checks carried out to approximately 10% of Main Area)

  1. Installation of base termination detail (effective seals)
  2. Installation of wall cladding construction, composite or built up (fixing layout, support system, effective air seals)
  3. Installation of details / flashings at corner, cappings and openings  (fixing layout, effective seals, aesthetics)

Note: Inspections are cross checked with the agreed specification, project specific drawings and manufacturers guidelines